Erdemli-Silifke-Taşucu 13th Region Border Highway, Yeşilovacık-Aydıncık Section

  • Mersin Yol 007
  • Mersin Yol 013
  • Mersin Yol 020
  • Mersin Yol 028
  • Mersin Yol 033
  • Mersin Yol 036
  • Mersin Yol 054
  • Mersin Yol 067
  • Mersin Yol 076
  • Mersin Yol 078
  • Mersin Yol 109
  • Mersin Yol 175
  • Mersin Yol 176
  • Mersin Yol 181
  • Mersin Yol 182
  • Mersin Yol 186
  • Mersin Yol 192
  • Mersin Yol 194
  • Mersin Yol 240
  • Mersin Yol 243
  • Mersin Yol 255
  • Mersin Yol 266
  • Mersin Yol 290
  • Mersin Yol 291
  • Mersin Yol 296
  • Mersin Yol 381
  • Mersin Yol 386
  • Mersin Yol 423
  • Mersin Yol 425
  • Mersin Yol 430
    FACTS & FIGURES
    Client :

    General Directorate of Highways (KGM)

    Contractor:

    Özaltın Construction Co., Inc.

    Location :

    Yeşilovacık-Aydıncık Section, TÜRKİYE

    Length of Highway:

    28.51 km

    Platform Width:

    25 m (2X2 State Highway)

    Paving Type:

    Asphalt Pavement

    Number of Tunnels:

    9

    Length of Tunnels:

    26,760 m (9 Twin-Tube Tunnels, 13,320 m long one-way)

    Number of Viaducts:

    5

    The construction of Km:125+050-153+560 (Yeşilovacık-Aydıncık) section of Erdemli-Silifke-Taşucu 13th Region Border Road Project, is a 28-kilometer section of D-400 State Road (the Mediterranean Coastal Road), which is the southernmost highway of the east-to-west arterial highways in Türkiye.

    In 2017, upon completion of 4 tunnels with a total length of 2,500 meters, 7-kilometer section of the highway was put into service as a 2x2 divided highway. The ongoing project aiming to construct a divided road with high geometric standards, includes 5 tunnels with a combined length of 11 kilometers and 5 viaducts totaling 1,660 meters. Within this section, Akkuyu Nuclear Power Plant Intersection Project was also completed and put into service on 31st July 2022.

    Together with the previously completed tunnels, upon the completion of the new tunnels and viaducts, total length of the highway will be 28 kilometers, reducing the current length of 35 kilometers by 7 kilometers.

    FACTS & FIGURES
    Client :

    General Directorate of Highways (KGM)

    Contractor:

    Özaltın Construction Co., Inc.

    Location :

    Yeşilovacık-Aydıncık Section, TÜRKİYE

    Length of Highway:

    28.51 km

    Platform Width:

    25 m (2X2 State Highway)

    Paving Type:

    Asphalt Pavement

    Number of Tunnels:

    9

    Length of Tunnels:

    26,760 m (9 Twin-Tube Tunnels, 13,320 m long one-way)

    Number of Viaducts:

    5