Design and Construction of the Brașov – Târgu Mureș – Cluj – Oradea Motorway, Section 3B: Mihăiești – Suplacu de Barcău (Including the Meseș Tunnel)

  • Haber No 1 Slider
    FACTS & FIGURES
    Client:

    Romanian National Company for Road Infrastructure Administration (CNAIR)

    Contractor:

    Özaltın-Makyol Joint Venture

    Location:

    Salaj County, ROMANIA

    Total Highway Length:

    41 km

    Platform Width:

    26 m (Dual carriageway, 2x2 lanes)

    Pavement Type:

    Asphalt Pavement

    Number of Tunnels:

    1 (Meseș Tunnel)

    Total Tunnel Lenght:

    5,780 m (Twin-tube, 2,890 m each)

    The project is located in Sălaj County, in the northwestern part of Romania, within the Transylvania region. As part of the A3 Motorway (Brașov – Târgu Mureș – Cluj – Oradea), it represents a critical segment of the strategic transport corridor connecting Bucharest with the Transylvania region.

    The contract includes an 18-month design pase, followed by a 60-month construction period. The works encompass a total of 41 kilometers of dual carriageway motorway (2x2-lanes), divided into two subsections: Poarta Sălajului – Zalău, which spans 15.14 kilometers and includes the Meseș Tunnel, and Zalău – Nușfalău, which extends 25.86 kilometers.

    A major component of the project is the construction of a 2.89-kilometer twin-tube tunnel, which will be the longest motorway tunnel in Romania. In addition to tunnel works, the project involves the construction of 14 viaducts, 21 bridges, and 7 overpasses, with a total combined structure length exceeding 7,980 meters.

    The scope further includes the development of two motorway service areas, a Maintenance and Operations Center, and a Tunnel Monitoring and Intervention Facility. The project also comprises comprehensive geotechnical and hydrotechnical works, including foundation strengthening and ground improvement.

    FACTS & FIGURES
    Client:

    Romanian National Company for Road Infrastructure Administration (CNAIR)

    Contractor:

    Özaltın-Makyol Joint Venture

    Location:

    Salaj County, ROMANIA

    Total Highway Length:

    41 km

    Platform Width:

    26 m (Dual carriageway, 2x2 lanes)

    Pavement Type:

    Asphalt Pavement

    Number of Tunnels:

    1 (Meseș Tunnel)

    Total Tunnel Lenght:

    5,780 m (Twin-tube, 2,890 m each)