Oşkan-Berkman Hydro-Solar (Hybrid) 170-kV Overhead Power Line

  • Berkman Oskan Iletim Hatlari 001
  • Berkman Oskan Iletim Hatlari 010
  • Berkman Oskan Iletim Hatlari 022
  • Berkman Oskan Iletim Hatlari 023
  • Berkman Oskan Iletim Hatlari 025
  • Berkman Oskan Iletim Hatlari 030
  • Berkman Oskan Iletim Hatlari 032
  • Berkman Oskan Iletim Hatlari 040
  • Berkman Oskan Iletim Hatlari 042
  • Berkman Oskan Iletim Hatlari 045
  • Berkman Oskan Iletim Hatlari 048
  • Berkman Oskan Iletim Hatlari 049
  • Berkman Oskan Iletim Hatlari 077
  • Berkman Oskan Iletim Hatlari 078
  • Berkman Oskan Iletim Hatlari 089
  • Berkman Oskan Iletim Hatlari 090
  • Berkman Oskan Iletim Hatlari 092
  • Berkman Oskan Iletim Hatlari 093
  • Berkman Oskan Iletim Hatlari 096
  • Berkman Oskan Iletim Hatlari 105
  • Berkman Oskan Iletim Hatlari 112
    FACTS & FIGURES
    Client:

    General Directorate of Turkish Electricity Transmission Corporation (TEİAŞ)

    Investor:

    Enova Energy Company (50% held by Özaltın Construction Company)

    Location:

    Kadirli-Osmaniye, TÜRKİYE

    Length of the Line:

    8 km

    Number of Towers:

    55

    Status:

    In Operation

    The project comprised the construction of an 8-kilometer long, 170-kV overhead power line between the Oşkan hydroelectric power plant and the Berkman hydroelectric power plant in the province of Osmaniye, connecting the existing national electricity network in the Kadirli province of Osmaniye with a length of 10 kilometers out of a total distance of 18 kilometers.

    The contract included project planning, felling, construction roads, the erection of 55 galvanized lattice towers and tower foundations, as well as the installation of a three-phase, double-circuit, 1,272 MCM stranded conductors and overhead earth wires with deployment.

    The extremely rugged and steep terrain presented challenges related to access and constructability, yet the project was completed safely, efficiently, on time, and within budget.  It also enhances the renewable energy integration between the plants and the security of the transmission system in the region.

    FACTS & FIGURES
    Client:

    General Directorate of Turkish Electricity Transmission Corporation (TEİAŞ)

    Investor:

    Enova Energy Company (50% held by Özaltın Construction Company)

    Location:

    Kadirli-Osmaniye, TÜRKİYE

    Length of the Line:

    8 km

    Number of Towers:

    55

    Status:

    In Operation