Beyhan I Concession Project Profile

  • Beyhan HES 002
  • Beyhan HES 004
  • Beyhan HES 010
  • Beyhan HES 011
  • Beyhan HES 017
  • Beyhan HES 020
  • Beyhan HES 022
  • Beyhan HES 023
  • Beyhan HES 024
  • Beyhan HES 025
  • Beyhan HES 036
  • Beyhan HES 035
  • Beyhan HES 039
  • Beyhan HES 040
  • Beyhan HES 042
  • Beyhan HES 043
  • Beyhan HES 045
  • Beyhan HES 047
  • Beyhan HES 048
  • Beyhan HES 049
  • 01 Beyhan Hava 2019 0001 (1)
  • 02 Beyhan Hava 2019 0036
  • 03 Beyhan Hava 2019 0008
  • 04 Beyhan Hava 2019 0011
  • 05 Beyhan Hava 2019 0017
  • 06 Beyhan Hava 2019 0101
  • 07 Beyhan Hava 2019 0102
  • 08 Beyhan Hava 2019 0013
  • 09 Beyhan Hava 2019 0050
  • 10 Beyhan Hava 2019 0014
  • 11 Beyhan 1 Baraji Ve Hes (8)
  • 12 Beyhan Hava 2019 0027
  • 13 Beyhan 1 Baraji Ve Hes (7)
  • 14 Beyhan 1 Baraji Ve Hes (5)
  • 15 Beyhan 1 Baraji Ve Hes (6)
  • 16 Beyhan 1 Baraji Ve Hes (2)
  • 17 Beyhan 1 Baraji Ve Hes (3)
  • 18 Beyhan 1 Baraji Ve Hes (4)
  • 19 Beyhan 1 Baraji Ve Hes
    FACTS & FIGURES
    Location:

    Elazığ, TÜRKİYE

    Investment Company:

    Kalehan Energy

    Shareholding:

    Özaltın İnşaat 50%; Cengiz İnşaat 50%

    Contract Model:

    Build-Operate-Transfer (BOT)

    Concession Period:

    49 Years

    Installed Capacity:

    582.10 MW

    Annual Power Generation:

    1.950 billion kWh

    Project Status:

    Operational

    Project’s Overview

    The Beyhan I Dam and Hydroelectric Power Plant is located in Elazığ Province, eastern Türkiye, on the Murat River, a major tributary of the Euphrates.

    Kalehan Energy, the special purpose vehicle (SPV) that implemented Beyhan I, was established by Özaltın Construction and Cengiz Construction. Each founder holds 50% of the company’s share capital. The SPV owns and operates the facility.

    Beyhan I was the first project to enter operation in the hydropower cascade along the lower stretches of the Murat River. The development was originally planned to encompass four projects under the build–operate–transfer (BOT) model, with a 49-year concession period for each project and a combined installed capacity of 2,350 MW.

    The project features a roller-compacted concrete (RCC) gravity dam that rises 97 m above its foundation and has a crest length of 521 m, including the spillway. The reservoir has a total storage capacity of 369.06 million m³.

    The powerhouse is fitted with three vertical-shaft Francis turbine-generator units, each rated at 183.5 MW, and a 31.6 MW environmental-flow unit. The plant’s total installed capacity is 582.10 MW. Beyhan I reached full operating capacity in May 2015, when its fourth generating unit entered into service.

    By producing more than 1.950 billion kilowatt-hours of hydroelectricity annually, Beyhan I supports Türkiye’s economic development and strengthens its energy security. The project also helps reduce reliance on fossil fuels and is estimated to avoid greenhouse gas emissions equivalent to approximately 1.04 million tonnes of CO₂ per year.

    FACTS & FIGURES
    Location:

    Elazığ, TÜRKİYE

    Investment Company:

    Kalehan Energy

    Shareholding:

    Özaltın İnşaat 50%; Cengiz İnşaat 50%

    Contract Model:

    Build-Operate-Transfer (BOT)

    Concession Period:

    49 Years

    Installed Capacity:

    582.10 MW

    Annual Power Generation:

    1.950 billion kWh

    Project Status:

    Operational