Lower Kaleköy Concession Project Profile

  • 01 Asagi Kalekoy Havadan 2021 0194
  • 02 Asagi Kalekoy Havadan 2021 0199
  • 03 Asagi Kalekoy Havadan 2021 0198
  • 04 Asagi Kalekoy Havadan 2021 0031
  • 05 Asagi Kalekoy Havadan 2021 0014
  • 06 Asagi Kalekoy Havadan 2021 0155
  • 07 Asagi Kalekoy Havadan 2021 0010
  • 08 Asagi Kalekoy Havadan 2021 0201
  • 09 Asagi Kalekoy Havadan 2021 0222
  • 10 Asagi Kalekoy Havadan 2021 0237
  • 11 Asagi Kalekoy Havadan 2021 0334
  • 12 Asagi Kalekoy Havadan 2021 0336
  • 13 Asagi Kalekoy Havadan 2021 0340
  • 14 Asagi Kalekoy Havadan 2021 0341
  • 15 Asagi Kalekoy Havadan 2021 0342
  • 16 Asagi Kalekoy 2021 0185
    FACTS & FIGURES
    Location:

    Bingöl, TÜRKİYE

    Investment Company:

    Kalehan Energy

    Shareholding:

    Özaltın İnşaat 50%; Cengiz İnşaat 50%

    Contract Model:

    Build-Operate-Transfer (BOT)

    Concession Period:

    49 Years

    Installed Capacity:

    500.00 MW

    Annual Power Generation:

    1.910 TWh

    Project Status:

    Operational

    Project’s Overview

    The Lower Kaleköy Dam and Hydroelectric Power Plant (Aşağı Kaleköy) is located in Bingöl Province, eastern Türkiye, on the Murat River, a tributary of the Euphrates.

    Özaltın and Cengiz, two construction firms, established Kalehan Energy as a special purpose vehicle (SPV) in which they hold an equal number of shares. Kalehan Energy implemented the Lower Kaleköy project and now serves as the plant’s owner-operator.

    Lower Kaleköy was the third project to reach completion in the hydropower cascade along the lower reaches of the Murat River. The scheme was initially conceived as a four-project development under the build–operate–transfer (BOT) model, with a 49-year concession period for each project and a combined installed capacity of 2,350 MW.

    The Özaltın–Cengiz Joint Venture built the composite dam and hydropower plant. The dam rises 95 meters above the riverbed and has a crest length of 945 meters. It impounds the Murat River to form a reservoir with a total storage capacity of 556.30 million cubic meters.

    The powerhouse is equipped with three 155.49 MW Francis turbines, each paired with a vertical-axis synchronous generator, and one 33.53 MW environmental-flow unit. The plant has a total installed capacity of 500.00 MW. Construction began in early 2016 and was commissioned in December 2019. The plant entered commercial operation in the first quarter of 2020.

    The plant generates approximately 1.910 TWh of electricity annually, contributing to Türkiye’s renewable electricity supply. It is estimated to avoid greenhouse gas emissions from grid electricity generation, with annual CO₂ savings of approximately 1.02 million tonnes.

    FACTS & FIGURES
    Location:

    Bingöl, TÜRKİYE

    Investment Company:

    Kalehan Energy

    Shareholding:

    Özaltın İnşaat 50%; Cengiz İnşaat 50%

    Contract Model:

    Build-Operate-Transfer (BOT)

    Concession Period:

    49 Years

    Installed Capacity:

    500.00 MW

    Annual Power Generation:

    1.910 TWh

    Project Status:

    Operational